MG Park, Greve
Belgian MG-Group is building a large logistics center on bare land in Greve, and Tscherning is handling the site development. The total area of 25 hectares will accommodate 100,000 m2 of buildings and 80,000 m2 of paving and facilities.
A site development project like this is among Tscherning Anlæg's core competencies, and this particular one is connected to a SUDS project for KLAR Forsyning that we have previously carried out.
Tscherning is involved in the earliest phases of the project, which allows us to optimize the solutions for the individual tasks in the contract in close collaboration with the client.
The client starts construction on bare ground with topsoil on top. Therefore, we start by removing the growth layer and adding stable topsoil. In this connection, 75,000 m3 of topsoil was removed and 40,000 m3 of raw soil was driven onto the site. In addition, 100,000 m3 of slag was added, as this material with lime/cement stabilization is well suited as a base for the 11 buildings that will be located along a central 350 meter long road.
A complex network of utilities has been laid across the huge site - rainwater and wastewater (a major project in itself, including the KLAR Forsyning, Greve project - see below), district heating, telephone, internet, electricity supply and street lighting. On the surface, paving has been laid all the way around the complex and roads have been laid on the site to the boundary and access from the public road.
A large arsenal of equipment is required for a job of this scale and includes four +20-ton excavators, three 14-ton excavators, two dozers and three dump trucks.
In connection with the construction project, Tscherning has also carried out a comprehensive drainage project for Greve Municipality. Here, a network of water pipes and drains will lead rainwater from the site into basins designed for the purpose.